- RP Date
- YE 46.8
To: Star Army Engineering
Fujiko Development Corporation
Bureau of Fujiko Engineers
To Whom It May Concern,
The Bureau of Fujiko Engineers, with the completion of several FSDF Defense Bases, is commencing Project Veiled Fortress. A comprehensive defense infrastructure project within key areas on Fujiko IV and Ukmirt A4. The project entails the design and development of a network of reinforced bunkers and concealed tunnel systems based on lessons from the Kuvexian invasion of YE 42. This infrastructure will serve as a backbone for regional security, ensuring our capability to slow down invaders and to support Star Army of Yamatai operations on these planets. To achieve these objectives, the Bureau respectfully submits this formal request for specialized engineering expertise and resources to construct hardened bunker complexes capable of withstanding substantial external pressures and ensuring sustained operational capacity under various conditions.
The proposed network will include:
Sincerely,
Monique Ruby
Bureau of Fujiko Engineers
Fujiko Development Corporation
Fujiko Development Corporation
Bureau of Fujiko Engineers
To Whom It May Concern,
The Bureau of Fujiko Engineers, with the completion of several FSDF Defense Bases, is commencing Project Veiled Fortress. A comprehensive defense infrastructure project within key areas on Fujiko IV and Ukmirt A4. The project entails the design and development of a network of reinforced bunkers and concealed tunnel systems based on lessons from the Kuvexian invasion of YE 42. This infrastructure will serve as a backbone for regional security, ensuring our capability to slow down invaders and to support Star Army of Yamatai operations on these planets. To achieve these objectives, the Bureau respectfully submits this formal request for specialized engineering expertise and resources to construct hardened bunker complexes capable of withstanding substantial external pressures and ensuring sustained operational capacity under various conditions.
The proposed network will include:
- Hardened Bunkers: Reinforced structures capable of enduring significant environmental and tactical stressors, providing secure staging areas and supply depots.
- Concealed Tunnel Systems: Subterranean passageways connecting key sites, designed for both logistical efficiency and stealth, allowing controlled movement and access without detection.
- Subterranean excavation and stabilization techniques.
- High-strength reinforcement and blast-resistant materials.
- Advanced ventilation, water management, and energy systems for sustained operation in enclosed environments.
Sincerely,
Monique Ruby
Bureau of Fujiko Engineers
Fujiko Development Corporation
Last edited: