Patrick looked back at Elisto. "The only vehicles we have are construction vehicles. Not made to carry people or move very fast. So if we were to 'bug out' we would have to do it on foot. It makes more sense for us to wait here for transport to arrive."
When they emerged from the tunnel, the work site was clearly visible. The SSS personnel had cleared the area of trees and erected some temporary structures. As said all of the equipment was construction related. The people were going through the structures and bringing out containers with samples.
"You Star Army, we actually may have something we can use to get the folks away from here, it won't be comfortable, but it will work." He said crossing over to the MOLE. "Never mind the samples, everyone get your butts over here. This here Star Army pilot says we need put out, so everyone get into the MOLE and we'll head away from here."
---------------------------------
With the reactor room now filled with several inches of water from Silic's external cooling of the reactor, the status board for the reactor was showing all green. The reactor had completed shutdown and core temp was back within tolerance.
---------------------------------
Anne's patient's vital signs improved some with the treatment of hemosynth fluid. However, her scanner showed that there was an injury that she would have to take direct action on. It seemed that a large shard of her armor was bent into her body and would not allow that area to heal.